Engineering Expansion Project - ELW Stair 5 Exterior Exit Temporary Closure

ELW Building B-Wing.

In support of the Engineering Expansion Project, Bird Construction and FMGT Project Management Services have taped off the level 1 exterior exit from Stair 5 in ELW B-Wing. This is for safety, due to work occurring on the EE construction site directly outside of this door. This exit is temporarily closed while this work is underway, and alternate exits should be used. See attached map.

Thursday September 19, 2024


View/Download notice: facilities/20240911-f04057-ee-proj-notice-elw-stair-5-exterior-exit-temporary-closure.pdf

 

Contact: Orianne Johnson, Project Manager, oriannejohnson@uvic.ca

Contact: Adam Gerber, Project Manager, apgerber@uvic.ca